North Gabon is the site of Perenco’s largest surface redevelopment project to date. To streamline operations for further development, Perenco overhauled the infrastructure:
• Development of Olende and M’Polunie Fields
• Construction of two power plants (14MW each) and high-voltage electrical distribution
• Laying of a distribution network linking Libreville and Port-Gentil to gas reserves
• Installation of a dual-product, 2 million-barrel, offshore terminal