Perenco operates five compression hubs/gas gathering platforms with their connecting pipelines to Bacton on the Norfolk coast.
Various satellite fields also flow through these hubs.
Perenco also operates the Pickerill field (Block 48/11) which flows gas through a dedicated pipeline to the Conoco operated gas receiving terminal at Theddlethorpe.
In addition to its own and joint-venture partner equity gas, Perenco transports a significant quantity of third-party gas through its operated infrastructure.
Perenco continues to look for additional material exploration and producing asset opportunities in the UKCS to extend the lifespan of its assets through efficient operations and commercial optimisation.